| arrival |  | The arrival of the 260 Z
| | 28 images | | | tear down |  | Tearing down and starting to clean up the 260 chassis
| | 51 images | | | frame rebuild |  | Repairing the damaged from from a prior body shops shoddy work
| | 13 images | | | engine pull |  | Pulling the 280 fuel injected engine from the 280 body
| | 11 images | | | suspension |  | Swapping the high performance suspension on the 280 over to the 260
| | 34 images | | | electrical |  | Rewiring all the electrical of the Z
| | 7 images | | | build up |  | Putting it all together
| | 127 images |
|